Schedule questions
Ask questions about dates, float and what-if scenarios and receive structured answer cards. The assistant selects a calculation and gets its numerical results from the CPM engine using the active schedule.
Critical path analysis
Compute the zero-float task chain and identify the current schedule driver. The CPM engine calculates the result from imported or built schedule activities and their logic.
Baseline variance tracking
Compare actual task dates with a frozen baseline and show slippage in working days. Users mark tasks complete with actual dates, and positive variance means late.
Schedule file exchange
Import Primavera P6 XER, Microsoft Project XML and .mpp files from Project 2010 onward, then export schedules or reports. Export formats include Excel, CSV, printable PDF, XER and MS Project XML.
Target-date recovery
Produce costed options for reaching a specified finish date, including tasks to shorten and links to overlap. The CPM engine verifies the proposed changes.